⸻ TECHNICAL CAPACITY

When the project demands greater capacity or control, it's time to act.

In critical phases, a quick decision can make the difference between stability and technical overload.

  • 01 Workload peaks
  • 02 Complex coordination across disciplines
  • 03 Tight deadlines
  • 04 Reliable model for execution
  • 05 High technical complexity renovation
First Contact

How do we handle the first contact?

We don't send standard proposals. First, we understand:

  • 01 What phase the project is in
  • 02 Which disciplines are involved
  • 03 Where pressure or risk is generated
  • 04 What level of intervention is required
01
ARCHITECTURE
🏛️

For architecture firms

If you need to expand BIM capacity without increasing fixed structure, we integrate into your existing workflows and standards.

02
CONSTRUCTION
🏗️

For construction companies

If you're looking for greater technical control during the execution phase, reinforcement in architecture and installations, or generation of a reliable As-Built model, we intervene with an operational approach.

Information to evaluate your project

Project type

Define whether it's residential, commercial, industrial, or mixed-use.

Current phase

Indicate whether it's in design, coordination, or execution.

Approximate area

Provide the estimated total area of the project.

Required scope

Modeling, coordination, construction, or Scan-to-BIM.

Planned timeline

Indicate key dates and estimated project duration.

Contact Us

Email: contacto@360bim.com

Phone: +34 600 123 456

Location: Seville, Spain

Projects throughout Spain